Six months after delivery, a client asks where the forecast on slide 14 came from. The analyst who prepared the slide has moved to another project. The final deck is on the shared drive, and the team has an export of its AI chats. Somewhere in that history is a draft of the forecast. Which inputs survived into the version the client received?
A transcript records what someone asked and what the model returned. It can help reconstruct how an idea developed. To answer the client’s question, the team also needs an audit trail that connects the approved slide to its evidence, the checks that ran and the person who signed off.
Start with the slide the client received
Identify the deliverable, its version and the claim the client is asking about. A slide number alone can be ambiguous after a deck is reordered. Pair it with a version or delivery date and the exact wording or figure. A reviewer should be able to find the approved claim without opening a stack of almost identical decks.
For example, slide 14 might show projected annual savings of £1.2 million. The engagement record should point to the final slide, the workbook tab that produced the estimate, and the source documents for the inputs. If the workbook uses assumptions about staffing or adoption, identify those assumptions next to the calculation.
Record the check and its result
A check should tell the next reader what a reviewer actually did. For the savings estimate, that could mean confirming the baseline against the client’s operating data, recalculating the estimate and confirming that the slide labels the figure as a projection. Record the outcome for each material check and explain any exception.
If an early draft double-counted a cost category, capture the correction and identify the version where it was made. That helps a reviewer understand why an earlier number differs and which result the engagement team approved. See our guide to checking AI-drafted claims for a practical way to document the evidence and decision.
Capture sign-off while the context is fresh
Record who checked the work, who approved the final version and when. In a small team, one person may hold several roles. The record should still make it clear who made the decision and what they approved. If a material number changes after sign-off, attach the new check and approval to the updated version.
Keep links to the approved evidence in the engagement’s authorised workspace. Apply the client’s requirements for access and retention, and avoid duplicating confidential transcripts when a reference will do.
Run a retrieval test before closing the engagement
Choose a key claim and give the final deliverable to someone who did not prepare it. Ask them to locate the source, reproduce or explain the check, and identify who signed off. If they need to call the original analyst or search old chats for the answer, add the missing reference before the team moves on.
A chat can be part of that record. The test is whether someone can answer the client’s question from the approved engagement file months after the work was delivered.
What a useful audit entry looks like
For slide 14, record the delivered version, the £1.2 million savings projection, the workbook tab and source files, and the result of the recalculation. Add the review date, the approver and any assumptions that remain open. If a factor depends on a planned rollout, make that dependency visible.
Store the entry beside the approved deliverable in the authorised workspace. If the client requests a revision, add a new entry linked to the new version and keep the earlier decision available according to the engagement’s retention rules. That gives a later reviewer a clear path from the question to the evidence.
Write an entry another reviewer can use
Imagine the approved pack has two savings figures. Slide 14 gives projected annual savings at full adoption, while the appendix gives first-year savings after rollout costs. An entry for slide 14 should use the exact label from the deck and identify the workbook output for full adoption. That tells the reviewer which figure belongs to which question before they inspect the formula.
Record the result of the actual check. For example, the reviewer recalculated the figure from the approved staffing baseline, tied the inputs back to their source and confirmed that the slide labels the number as a projection. If the input relies on an assumption about adoption, link the assumption so the client can see what would change the result.
Keep earlier decisions linked to later revisions
Suppose the client sends an updated staffing file after sign-off. Record the new input version, describe which assumptions changed and link the revised check to the replacement slide. Keep the earlier review record associated with the previously delivered pack according to the engagement’s retention rules. A client may still be looking at that version when they ask a question.
At closeout, test the chain in both directions. Start with a slide and find its source, check and approval. Then start with a changed source file and identify the claims that relied on it. If someone can trace the first direction but cannot find the affected slides in the second, add those links while the team still has the context.
Keep the important records easy to retrieve. A short entry that points to a stable location is easier to use than a long record with no version references. Save it in the approved workspace and check that the people expected to answer a future request can access it.
Get new posts and free tools